DBC Consultants acts as the General Designer for the project -“Reconstruction of the main production building of the North Milk Plant”, Gryazovets.
The design team of DBC Consultants performs work on the development of design documentation and includes the following activities:
The production site of the plant is located in the southeast of the city of Gryazovets and occupies 4.7 hectares. The plant is equipped with Czech equipment; during the reconstruction, equipment of Russian and Swedish manufacturers was additionally installed. The production capacity of the milk processing plant currently ranges from 200 to 400 tons. Northern Milk JSC is at the stage of reconstruction of the existing main production building.
The premises of the plant are intended for the production of milk and dairy products.
The reconstruction of the plant will provide:
Completion of design work is scheduled for 2020.